EFS: Extreme Frac Solution

The Extreme Frac Solution “EFS” was designed to help reduce Frac rig up and down times by eliminating the down joints between well bore and zipper manifolds. Our EFS system has a number of important benefits and safety reducers.

frac

– Frac Rig up/down time savings

– No Down Joints to leak at multiple spots

– Reduces the total number of connections that can leak by over 50%

– Reduces turbulence points by using all 7” bore equipment

– All equipment is Tested on location prior to Frac rig up

– Extreme Personnel on location to operate and grease valves 24/7